Pre-engineered Buildings

Modular design was originally employed to solve construction problems in remote locations and harsh environments. Today, TOZZI’s modular construction approach allows for a significant reduction of construction time as well as savings in terms of engineering and resources management, making it a preferred solution for onshore, offshore and floating installations.

 

All modules are designed to satisfy the Customer’s requirements, with special attention paid to design specifications. Innovation, entrepreneurial attitude and technological challenges are the principles upon which TOZZI’s activity is based.

 

We offer highly technical engineering solutions, already field tested and improved through years of experience. Technical requirements and attention to details are coupled with a clockwork execution. The result is a product showing all the skills of a sector-leading company. TOZZI boasts a considerable know-how in the offshore oil & gas market and offers its Customers a fully integrated end product, ready for installation, complete and fully tested.

WHAT WE DO:

  • E-HOUSE/LOCAL ELECTRICAL ROOM
  • CENTRAL CONTROL ROOM
  • LIVING QUARTER
  • TEMPORARY REFUGE
  • MODULARIZED ELECTRICAL AND/OR INSTRUMENTATION SUBSTATION
  • MODULAR PIPE RACKS

Projects

Our products range from integrated buildings to logistical/residential buildings, living quarters, temporary refuges, modular substations, e-houses and control rooms, power generation modules, other industrial shelter and cabins, pre-fabricated pipe racks.

Kashagan – P&U Buildings
Kashagan – P&U Buildings
Kashagan – P&U Buildings

Process & Utilities Buildings

Engineering Procurement and Construction of Process & Utilities Buildings (PUBs) for the Kashagan Field, Offshore Complex A&D, Republic of Kazakhstan, as follows:

  • PSA1 Oil Export Pump House
  • PSA1 Oil Booster Pump House
  • PSA2 Oil Export Pump House
  • PSA2 Oil Booster Pump House
  • PUA Chemical Injection Building
  • PUA Methanol Injection Building
  • PUA Fuel Gas & Nitrogen Compressor Building
  • LSA Breathing Air Generator (WABAS) Building
  • Drilling Island Temporary Refuge

 

Module size & weight:

  • PSA1 Oil Export Pump House                                 L 20m – W 11m – H 9m & L 20m – W 11m – H 9m, weight 650 tons
  • PSA1 Oil Booster Pump House                               L 26m – W 11m – H 8m, weight 430 tons
  • PSA2 Oil Export Pump House                                 L 20m – W 11m – H 9m & L 20m – W 11m – H 9m, weight 720 tons
  • PSA2 Oil Booster Pump House                               L 26m – W 13m – H 8m, weight 440 tons
  • PUA Chemical Injection Building                              L 44m – W 12m – H 5m, weight 515 tons
  • PUA Methanol Injection Building                              L 34m – W 14m – H 7m, weight 585
  • PUA Fuel Gas & Nitrogen Compressor Building        L 15m – W 13m – H 10m & L 21m – W 13m – H 10m, weight 730 tons
  • LSA Breathing Air Generator (WABAS) Building       L 45m – W 8m – H 10m, weight 560 tons
  • Drilling Island Temporary Refuge                              L 41m – W 14m – H 7m & L 41m – W 14m – H 7m, 2,090 tons
Kashagan – Local Equipment Rooms (LERs)
Kashagan – Local Equipment Rooms (LERs)
Kashagan – Local Equipment Rooms (LERs)

Local Equipment Rooms

Engineering Procurement and Construction of Local Equipment Rooms (LERs) for the Kashagan Field, Offshore Complex A&D, Republic of Kazakhstan, as follows:

  • Drilling Island LER
  • Island A LER
  • PSA1 LER
  • Riser Island LER
  • PSA2 LER
  • PUA LER
  • LSA LER
  • Drilling Island East LER
  • EDG LER
  • LSA IBEEV Utility Shelter

 

Modules size & weight:

  • Drilling Island LER             L 55m – W 15m – H 8m & L 35m – W 11m – H 10m, weight 1,500 tons
  • Island A LER                     L 36m – W 15m – H 10m, weight 800 tons
  • PSA1 LER                        L 48m – W 15m – H 8m & L 42m – W 15m – H 10m, weight 1,700 tons
  • Riser Island LER               L 48m – W 15m – H 8m & L 24m – W 12m – H 10m, weight 1,300 tons
  • PSA2 LER                        L 48m – W 15m – H 8m & L 42m – W 15m – H 10m, weight 1,700 tons
  • PUA LER                          L 57m – W 15m – H 8m & L 43m – W 15m – H 10m, weight 1,900 tons
  • LSA LER                          L 52m – W 15m – H 8m & L 36m – W 15m – H 10m, weight 1,600 tons
  • Drilling Island East LER     L 66m – W 15m – H 8m & L 48m – W 15m – H 10m, weight 2,100 tons
  • EDG LER                         L 43m – W 15m – H 10m & L 48m – W 15m – H 10m, weight 2,500 tons
  • LSA IBEEV Utility Shelter  L 36m – W 16m – H 11m, weight 800 tons
Bukit Tua Project
Bukit Tua Project
Bukit Tua Project

E-house

  • Lump sum EPC contract for an E-house to be installed on a FPSO complete with all switchgears, power transformer and db to be connected to the marine power supplying and topside process modules.

 